close Warning: Can't synchronize with repository "(default)" ("(default)" is not readable or not a Git repository.). Look in the Trac log for more information.

Changes between Version 1 and Version 2 of Internal/SummerInternship/Meetings/20110613


Ignore:
Timestamp:
Jun 13, 2011, 4:38:11 PM (13 years ago)
Author:
snelson
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Internal/SummerInternship/Meetings/20110613

    v1 v2  
    1 Routing Meeting Notes for June 13, 2011
     1= Routing Meeting Notes for June 13, 2011 =
     2
     3Tasks we discussed and plans for this week:
     4
     5=== Nehal ===
     6 
     7  * 2 or 3 Orbits nodes running (at least make sure neighbor tables are right)
     8  * do small study on SETT variance in static environment... purposely vary sending data rate
     9  * figure out how to set up small topology (using some ethernet filtering program)
     10
     11=== Kai ===
     12
     13  * simulate packet loss to make sure bitmap-based retransition works
     14  * read about how HOP handles (1) ACK losses and (2) initial signalling and make comparison chart
     15  * make timing diagram
     16
     17=== Sangeetha ===
     18
     19  * learn about splitting and merging algorithms
     20  * setup meeting w/ Ray
     21  * think about how to apply this to MobilityFirst
     22
     23=== Ayaka ===
     24 
     25  * think about how a flow could be established for real-time traffic using GUIDs
     26  * if a destination receiving traffic moves, how could networks use the GNRS to establish a new flow on-the-fly?
     27  * consider what a thin transport-layer protocol would look like over a hop-by-hop network
     28
     29=== Everyone ===
     30
     31  * think about open research question in the GSTAR spec
     32    * how are LETTs best computed?
     33    * how is the path storage metric best captured?
     34    * what changes are needed for GSTAR to automatically adapt to wired environments?