close Warning: Can't synchronize with repository "(default)" ("(default)" is not readable or not a Git repository.). Look in the Trac log for more information.

Internal/SystemPrototyping/Talkslides: Prototyping-NSF-EAB-Meeting-2-28-2011-post.pptx

File Prototyping-NSF-EAB-Meeting-2-28-2011-post.pptx, 5.0 MB (added by nkiran, 13 years ago)

Prototyping plan slides from EAB meeting 2/28/2011

HTML preview not available, since the file size exceeds 2.5 MB.Try downloading the file instead.